Views: 0 Author: Site Editor Publish Time: 2023-08-10 Origin: Site
Now many parks, productions, and communities can see all kinds of outdoor playgrounds. This kind of children's outdoor playground is also called unpowered amusement equipment. It is a kind of equipment that can be played without any power equipment. It can meet the characteristics of children running, jumping, crawling, drilling, swinging, etc. It can be entertainment or intellectual. Outdoor playgrounds are very suitable for children's development in all aspects. At the same time, this is also the reason why this type of equipment is hot. However, after we purchase this type of equipment and go back, it generally needs to be installed on-site, and it cannot be shipped after installation.
Here is the content list:
Preparation for outdoor playground installation
Outdoor playground installation process
After the outdoor playground is installed
Before installing the outdoor playground facilities, we need to reserve the installation position of each piece of equipment according to the design drawings, especially the size measurement of customized play structures, to ensure that each piece of amusement equipment can be installed within the venue, and maintain a certain amount of space between the equipment safe distance. According to the design plan, do the basic construction of the building on the drawing, and establish the installation reference point after the acceptance of the civil engineering part is successful. For some ground conditions that hinder the installation of amusement equipment in the outdoor playground, rectification and adjustment should be made, and the later installation will be carried out. Leveling, measuring, and testing the installation reference point to see if there is any need for adjustment. If there is, rectify it and do all-around pre-installation preparations.
When installing facilities in the outdoor playground, pre-embed support points according to the children's outdoor playground to be installed, and assemble anchor bolts and platforms at the pre-embedded places. The height of the anchor bolts and the height of the platform shall be constructed according to the design requirements. Install the disassembled parts of the amusement equipment according to the effect drawings of the previous design plan. To ensure the basic size, the position deviation should not be too large, and it needs to meet the design requirements. After installing the various parts of the outdoor playground amusement facility to the design position, connect these parts and connect them to form the overall outdoor playground facility.
After the installation of the outdoor playground is completed, it is necessary to inspect, accept and debug the installed playground equipment, carefully check every place that may have potential safety hazards, and re-install the places that do not meet the design requirements or are not installed to ensure sufficient safety reliable. After re-installation, detailed inspection and acceptance will be carried out again. Only after the installed amusement equipment meets the standards in all aspects, the installation of outdoor playground facilities will be considered complete.
If you are interested in our Outdoor playground products or have other needs, please feel free to contact us. Our official website is www.wb-toys.com. Our cost-effective products will bring you a better experience.