Availability: | |
---|---|
Quantity: | |
WB-PL0009
WB TOYS
20009
Product Description
Professional Outdoor Playground Equipment for Community consists of the following fun filled play components:
Sliding Activities (1)
Double Straight Slide
Climbing Activities (1)
Loop Pole Climber
Sensory & Dramatic Play (2)
Bubble Panel
Post Mount Steering Wheel
Demisions | 350*270*320cm |
Color | As per picture or customized |
Platform | 80*80cm |
Deck Height | 80cm |
Production Technology | Rotational Molding |
Materials | PP, Galvanized steel pipe, Stainless stell |
Mounting | Surface or Inground |
Application | Schools,family yard,beach,Residential zones,education organizations |
Certification | ASTM, CE, ISO9001 |
MOQ | 1 set |
Payment | T/T, W/U; 30% deposit before production, 70% balance before shipment |
HS Code | 950699000 |
Lead Time | 7 days after deposit. |
Material Description
Plastic elements
Slides, stairs, panels, decorations, and roofs are manufactured of food-grade plastic. All parts are rotational molded and perform durable and long-lasting. The wall thickness of plastic parts is more than 8mm, and these parts are anti-UV,anti-static, and anti-crack.
Main columns (tubes/poles)
Main columns are made of galvanized steel pipes which diameters are 76mm, 89mm, 114mm, and have a thickness of 2.2mm. Those pipes are strong and smooth. Aluminum pipes are optional.
Platforms (decks)
All platforms are shaped by piercing 2.2mm-thick cold-roll steel sheet, with bores of diameter 6mm, skid-proof, water-proof. The quality and technical standards are conforming to the European EN1176 standard.
Painting
through high-temperature pre-painting, antirust, and anti-corrosion process.
Other metal parts
All metal parts are made of galvanized steel pipes with diameters of 60mm, 48mm, 38mm, 32mm, 28mm, and thickness of 2.2mm. Quality and technical standards meet the requirements of the international standard.
Packing & Shipping
Packing
Plastic Parts: Bubble film and Stretch film
Metal Parts Cotton, Nylon
Shipping
Shipped in container
Port: Ningbo, Shanghai or other port in China.
Delivery time
In the term of FOB: 1 days after loading to Ningbo port.
In the term of CFR: based on the destination port.
In the term of DDU: based on the address and customs clearance process.
Installation
CAD instruction guide
Installation guide
On-site intallation service if necessary.